AAWSAP Statement of Objectives, July 2008

This is the 18 July 2008 Statement of Objectives for the DIA's Advanced Aerospace Weapon System Applications Program (AAWSAP). It sets out a contractor effort to study breakthrough aerospace technologies out to 2050 in twelve areas, with deliverables, security requirements and a five-year firm fixed price contract structure. It contains no incident reports or findings, only the contract scope.

Record
DOW-UAP-D110
Release
Release 06 · Sep 18, 2026
Incident
2008-07-18 · Washington, D.C.
Pages
4
Verdict
New
Source
war.gov ↗
Context · why this verdict

No overlap with earlier releases was found in the archive. The document is a routine contracting record, but its text defining AAWSAP's scope has not appeared in the archive before.

Findings in this document

3 findings

New SIG

DIA solicitation lists twelve study areas for far-term aerospace threats through 2050

  • Verbatim
    The objective of this program is to understand the physics and engineering of these applications as they apply to the foreign threat out to the far term, i.e., from now through the year 2050.
    DOW-UAP-D110 · Release 06 · page 1 · war.gov ↗
  • Verbatim
    5. spatial/temporal translation
    DOW-UAP-D110 · Release 06 · page 1 · war.gov ↗
  • Context

    The Statement of Objectives is dated 18 July 2008 and was issued by the DIA Acquisition Support Division (DWO-3). It lists twelve technical areas, including lift, propulsion, power generation, human effects and armament.

  • Inference · AI interpretation

    The emphasis on breakthrough technologies, rather than extrapolating current trends, suggests the program was framed as a study of possible technology discontinuities in foreign threats.

New or already public? The overlap check found no matching pages in earlier releases.

New SIG

Contract asks for per-area research reports by month ten and a final integrated threat assessment

  • Verbatim
    a comprehensive report and briefing forecasting potential advancements and their impact is to be submitted to the GPL by the end of the tenth month.
    DOW-UAP-D110 · Release 06 · page 3 · war.gov ↗
  • Verbatim
    Integrated Threat Assessment - A final report and briefing that assesses the foreign threat from advanced aerospace platforms
    DOW-UAP-D110 · Release 06 · page 3 · war.gov ↗
  • Context

    Other deliverables are monthly status reports and a project management plan for each technical area at the 60 day point.

New or already public? The overlap check found no matching pages in earlier releases.

New SIG

Contract specifies TS/SCI access, PhD team members, and a five-year firm fixed price term

  • Verbatim
    At least one member of each analytical team must have a PhD, although that member can be on several teams.
    DOW-UAP-D110 · Release 06 · page 2 · war.gov ↗
  • Verbatim
    All requirements specified in this SOO may be based on materials classified at or below Top Secret with access to Sensitive Compartmented Information (TS/ SCI).
    DOW-UAP-D110 · Release 06 · page 2 · war.gov ↗
  • Verbatim
    The term of this contract shall is anticipated to be 5 years which consists of a base year of 12 months from date of award plus four (4) 12 month option years.
    DOW-UAP-D110 · Release 06 · page 4 · war.gov ↗
  • Context

    The contracting officer and project leader names are redacted on page 4.

New or already public? The overlap check found no matching pages in earlier releases.

Page by page

The pages and what the AI read on them

The transcription is the page reader's: black bars mark what the government redacted; hatched tags mark personal data we removed.

Page 1

Page 1 of 4

This is page 1 of a 2008 Defense Intelligence Agency Statement of Objectives for the Advanced Aerospace Weapon System Applications Program. It describes the program's background, its objective of studying breakthrough aerospace weapon technologies out to 2050, and twelve required study areas.

STATEMENT OF OBJECTIVES FOR THE ADVANCED AEROSPACE WEAPON SYSTEM APPLICATIONS PROGRAM 18 July 2008 PAN: # 1. BACKGROUND: The Acquisition Support Division (DWO-3) of the Defense Intelligence Agency (DIA) has the responsibility to provide guidance and oversight to the Department of Defense (DoD) acquisition process along with leveraging the DoD Intelligence Community to coordinate, produce and maintain projections of the future threat environment in which U.S. air, naval, ground, space, missile defense and information systems operate. In order to accurately assess the foreign threat to U.S. weapon systems, a complete as possible understanding of potential breakthrough technology applications employed in future aerospace weapon systems must be obtained. 2. OBJECTIVE: One aspect of the future threat environment involves advanced aerospace weapon system applications. The objective of this program is to understand the physics and engineering of these applications as they apply to the foreign threat out to the far term, i.e., from now through the year 2050. Primary focus is on breakthrough technologies and applications that create discontinuities in currently evolving technology trends. The focus is not on extrapolations of current aerospace technology. The proposal shall describe a technical approach which discusses how the breakthrough technologies and applications listed below would be studied and include proposed key personnel that have experience in those areas. 3. REQUIREMENTS: a) The contractor shall complete advanced aerospace weapon system technical studies in the following areas: 1. lift 2. propulsion 3. control 4. power generation 5. spatial/temporal translation 6. materials 7. configuration, structure 8. signature reduction (optical, infrared, radiofrequency, acoustic) 9. human interface 10. human effects 11. armament (RF and DEW) 12. other peripheral areas in support of (1-11)
Page 2

Page 2 of 4

Page 2 of a 2008 AAWSAP Statement of Objectives setting out expert staffing, report format, past-performance references, and security and facility clearance requirements for a contractor performing advanced aerospace weapon system studies. The page sets no specific technical findings.

h) It is expected that numerous experts with extensive experience (minimum of 10 years) in breakthrough aerospace research and development will be required to meet the demands of the above program. The offeror should clearly identify their approach to obtaining the services of and their utilization of these scientific and technical experts. Management personnel must include a lead integrator to oversee the work of the various analytical teams, and to integrate their findings into final coherent products. At least one member of each analytical team must have a PhD, although that member can be on several teams. A technical plan for conducting the advanced aerospace weapon system studies described above must be included in the offeror's proposal. (c) Offeror must be able to produce integrated finished assessments in each of the above advanced aerospace weapon system technical areas. Finished reports and presentations, while highly analytical and technical, must be in a format suitable for dissemination at the highest levels of the federal government. In addition to the main technical section of each assessment, an executive summary utilizing clearly understandable (non-technical) language must also be contained in each report. (d) To assess relevant experience, offerors shall submit at least three (3) references, including a POC name and phone number, with a brief description of the business relationship with the Government or other corporations. In addition, offerors should provide examples, conducted within the past 7 years, of having performed, as a prime contractor, the analysis, design, construction, and flight testing of high performance aircraft and/or satellites. Success in this program is dependent upon this capability and experience. 4. PLACE OF PERFORMANCE: The work under this contract shall be performed at the Contractor's facility. 5. SECURITY REQUIREMENT: Contractor company and personnel proposed shall be clearable and able to obtain a security and facility clearance upon award of the contract. All requirements specified in this SOO may be based on materials classified at or below Top Secret with access to Sensitive Compartmented Information (TS/ SCI). The contractor shall comply with the terms and conditions of the DD-254 BEFORE initiating any classified effort. The contractor shall notify the COR and Contracting Officer immediately upon the determination that higher classification requirements exist in order to accomplish the specified requirements. The contractor shall ensure that each individual assigned to this contract shall be identified, cleared, and approved through DIA/DAC-3 PRIOR to granting that individual access to, or authority to generate classified information in association with this effort. 5.1. Contractor shall provide a work facility (including unclassified information systems) with a Top Secret Facility Clearance granted by the Defense Security Service (DSS). Cleared facilities are not required at contract inception. Offeror must provide personnel eligible for a Top Secret clearance level with further eligibility for SCI access. At least two personnel cleared at the Secret level are required at contract inception. 6. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT: The Government will provide the contractor access to computers and peripherals such as printers as the Government deems necessary to access and produce classified information. These computers and peripherals remain the property of the Government. 2
Page 3

Page 3 of 4

Page 3 of a 2008 statement of objectives setting out contract terms on government-furnished data, contractor-acquired property, equipment leasing, travel, and required deliverables, including research reports and an integrated threat assessment. No redactions appear on this page.

7. GOVERNMENT FURNISHED INFORMATION/DATA: Data required by the contractor to fulfill the terms of this contract shall be requested from the Government Project Lead (GPL). A good faith effort will be made to fulfill any legitimate request (as assessed by the GPL), however, the responsibility to collect information and data necessary for the conduct of this effort remains with the contractor. Any classified data provided by the Government in support of this contract will remain the property of the Government and will be returned to the government not more than 30 days after contract conclusion. 8. CONTRACTOR ACQUIRED / GOVERNMENT OWNED PROPERTY: Any accountable property acquired by the contractor with government funds during the execution of this contract shall become government owned property. The contractor shall obtain written permission from the CO or Contracting Officer Representative (COR) prior to any purchase of real property with government funds. The contractor shall establish and maintain an inventory of all such property. This property must be inventoried and returned to the government not more than 60 days after the end of the contract. 9. EQUIPMENT LEASE OR PURCHASE: The purchase of equipment is preferred, however, it may be more advantageous to the government to lease in certain circumstances. When it is contemplated a lease would be more advantageous to the government, contractor shall furnish the following information to the COR so the government can determine the best solution: 1. Estimated length of time the equipment will be used and the extent of use within that period 2. Financial and operating advantages of alternative types and makes of equipment 3. Cumulative rental payments for the estimated period of use 4. Net purchase price 5. Transportation and installation costs 6. Maintenance and other service costs 10. TRAVEL: It is anticipated that travel will be required for this contract. The Government will pay up to the rates specified in the government Federal Travel Regulations for travel destination. Travel reservations will be made by the contractor and will be reimbursed for actual costs only, with supporting documentation/receipts attached to the invoice. 11. DELIVERABLES: The contractor shall prepare the following deliverables: a. Status Reports - monthly reports outlining accomplishments, milestones, and work in progress. b. Project Management Plan - For each technical area, the team lead shall submit, at the 60 day point, an overview paper identifying the scope of the final report; a Plan of Action and Milestones, and the composition of the analytical team. c. Research Reports For each technical area, a comprehensive report and briefing forecasting potential advancements and their impact is to be submitted to the GPL by the end of the tenth month. An executive version of each report should also be submitted. Format will be specified by the GPL. d. Integrated Threat Assessment - A final report and briefing that assesses the foreign threat from advanced aerospace platforms incorporating the technologies discussed in the individual research reports will be
Page 4

Page 4 of 4 · 2 redactions

Page 4 of a statement of objectives covering resumes of key personnel, contract period of performance (five years, one base year plus four option years), firm fixed price contract type, key government personnel, and defined contract terms. The contracting officer and project leader names are redacted.

provided to the GPL at the end of the period of performance. An executive version of the report should also be submitted. Format will be specified by the GPL. e. Resumes - The Contractor shall submit resumes of all key personnel proposed for this effort. The Government reserves the right to review resumes and qualifications prior to acceptance of individuals for assignment. 12. PERIOD OF PERFORMANCE: The term of this contract shall is anticipated to be 5 years which consists of a base year of 12 months from date of award plus four (4) 12 month option years. 13. CONTRACT TYPE: The contract shall be firm fixed priced (FFP). 14. KEY GOVERNMENT PERSONNEL: The Contracting Officer for this contract will be [REDACTED (b)(3) 10 USC 424, (b)(6)] The COR and Government Project Leader will be [REDACTED] 15. DEFINED TERMS: Key personnel - defined as proposed management and lead science and engineering staff. Contracting Officer Representative (COR) - The government official appointed by the contracting officer and who is responsible for operations of the execution of the contract. The COR handles all aspects dealing with the interpretation and deliverables of the contract. Contracting Officer - Procurement official who holds a contracting warrant and is authorized to obligate the government under the terms of a contract and make changes to the contract.